Guides
The sums, worked through
Each of these takes one piece of trade paperwork and does it properly — the deduction, the refund, the reverse charge, the rate. Real figures, the arithmetic shown, and the traps that cost money when it is done by hand.
- Quoting
The quote that loses money is missing three lines
A day rate times a number of days is not a quote. The three lines most often left out, a worked extension example, and how to present a price a customer can compare.
Read → - CIS
What a contractor has to do before paying a subcontractor
Verify, deduct on labour only, file by the 19th, statement within 14 days. The sequence a CIS contractor owes HMRC, the four ways it goes wrong, and who carries the cost.
Read → - Getting started
Your first invoice decides how you get paid all year
Invoicing and record-keeping as a new subcontractor: what the invoice has to show, why materials need their own line, and the records that pay for themselves at the year end.
Read → - Drawing
Why a floor plan that looks right can still be 200mm out
A plan is a set of dimensions, not a picture. Where the millimetres go missing, a worked check on a 3.6m room, and how to tell a drawing that will build from one that will not.
Read → - Pricing
Pricing electrical work when the testing is the job
The visible work gets priced and the testing gets given away. A worked consumer unit quote with certificate time costed, per-point pricing, and why fault-finding is not a favour.
Read → - Pricing
Cleaning contract pricing: 25% on cost is not a 25% margin
Markup and margin are different numbers and the gap between them is where cleaning contracts quietly stop making money. Worked on a £7,800 contract.
Read → - Materials
How much plasterboard do I need? One room, worked out
Measure once, get sheets, bags and litres out. A worked three-room house, the coverage figures that decide the answer, and the rounding that wastes a sheet.
Read → - Employment
Holiday pay for variable hours workers: the 12.07% rule
The 12.07% accrual, where it applies, where it does not, and what it does to the price of a contract when it has been left out of the hourly rate.
Read → - VAT
The nine boxes on a VAT return, and what actually goes in each
Box 6 is not your turnover, box 4 is not what left your bank, and exempt sales belong in neither. A worked quarter, box by box, with the traps.
Read → - Pricing
Charge-out rate vs hourly rate: what your hour must earn
Day rates are usually a guess. Work backwards from overheads and the profit you want, and the number that comes out is often higher than the one being charged.
Read → - CIS
CIS deduction on materials and labour: what comes off what
The 20% deduction is not 20% of your invoice. Here is what it is calculated on, a worked example with materials, and how to spot a statement that does not add up.
Read → - CIS
CIS refund claim: worked through from start to finish
Why subcontractors overpay tax all year and get it back in April — one complete calculation with real figures, and what records you need to make it come out right.
Read → - VAT
Domestic reverse charge: a construction invoice worked through
When a builder must not charge VAT to another builder, what the invoice has to say, and where the VAT goes instead. One worked example, plus the end user exception.
Read →
These pages are general information, not tax or financial advice. Rates and thresholds change — each guide links to the current GOV.UK page.